Notice Requesting Public Comment on Draft Facility-Wide Synthetic Minor Air Quality Construction and Operation Permit for Miller & Long Co., Inc. – 66 New York Avenue NE Site

Notice is hereby given that Miller & Long Co., Inc. has applied for an air quality permit pursuant to the requirements of Title 20 of the District of Columbia Municipal Regulations, Chapter 2 (20 DCMR Chapter 2) to construct and operate the following emission units at the facility site located at 66 New York Avenue NW, Washington DC 20001:

CEMCO Concrete Batch Plant Model 275 with an attached 58 ton silo. 

CEMCO Concrete Batch Plant Model 275 with an attached 58 ton silo.

One factory mounted (CEMCO) generator set powered by a 173 hp John Deere diesel engine, Engine Family BJDXL06.8116 (Model year 2011)

One factory mounted (CEMCO) generator set powered by a 173 hp John Deere diesel engine, Engine Family BJDXL06.8116 (Model year 2011)

One MQ Power WhisperWattTM,  Model DCA400SSI4F3, 336 kWe generator set powered by an Isuzu Model BQ-6WG1X 512.3 hp (382 kWm) Diesel Engine (Model year 2021)

One MQ Power WhisperWattTM,  Model DCA400SSI4F3, 336 kWe generator set powered by an Isuzu Model BQ-6WG1X 512.3 hp (382 kWm) Diesel Engine (Model year 2021)

Pearson Model P-10-25W distillate fuel oil (No.2 fuel oil or diesel) fired boiler with heat input rating of 3.5 MMBTU/hr

The contact person for the facility is Paul McDonald at (302)-215-1029 or [email protected] .

The applicant has requested that limitations on the operation of the portable concrete plants and emergency generator sets be established in the permit pursuant to 20 DCMR § 200.6 to avoid the applicability of 20 DCMR § 300.1. Specifically, the applicant has requested an operating hour limit for all equipment at the site of 3,744 hours per unit per 12-month rolling period. Limits on the concrete production rate of 275 cubic yards per hour and 1,029,600 cubic yards in any consecutive 12-month period per plant have also been requested.

Factoring in these operational limits, the following is an estimate of the overall potential emissions from the facility:

FACILITY-WIDE EMISSIONS SUMMARY [TONS PER YEAR]

Potential Emissions with 20 DCMR § 200.6 Limits

With the operational limitations included in the draft permit, the Miller & Long Co., facility has the potential to emit approximately 6.25 tons per year of oxides of nitrogen (NOx), which is below the District’s major source threshold of 25 tons per year of NOx. Similarly, all other pollutants’ potential emissions are below their respective major source thresholds. As such, the facility is properly classified as a minor source and is not subject to 20 DCMR § 300.1.

Description and Emission Information for Units Being Permitted for the First Time:

The following units are being permitted through this permitting action. After each table of units, the proposed emission limits are specified.

Portable Concrete Mixing Plants: Two (2) portable temporary portable concrete plants with an associated boiler with a heat input rating of 3.5 MMBTU per hour:

CEMCO Concrete Batch Plant Model 275 with an attached 58 ton silo. 

CEMCO Concrete Batch Plant Model 275 with an attached 58 ton silo.

Non-Emergency Generator Sets Powered by Compression Ignition Internal Combustion Engines (CI-ICE) subject to New Source Performance Standards (NSPS): Four (4) non-emergency generator sets powered by diesel-fired engines subject to NSPS (40 CFR 60) Subpart IIII as described in the following table:

One factory mounted (CEMCO) generator set powered by a 173 hp John Deere diesel engine, Engine Family BJDXL06.8116 (Model year 2011)

One factory mounted (CEMCO) generator set powered by a 173 hp John Deere diesel engine, Engine Family BJDXL06.8116 (Model year 2011)

One MQ Power WhisperWattTM,  Model DCA400SSI4F3, 336 kWe generator set powered by an Isuzu Model BQ-6WG1X 512.3 hp (382 kWm) Diesel Engine (Model year 2021)

One MQ Power WhisperWattTM,  Model DCA400SSI4F3, 336 kWe generator set powered by an Isuzu Model BQ-6WG1X 512.3 hp (382 kWm) Diesel Engine (Model year 2021)

A. Emissions from the generator engines shall not exceed those emission standards specified in following table as tested pursuant to the applicable test methods in 40 CFR 1039, Subpart F [40 CFR Subpart IIII, 40 CFR 60.4204(b), 40 CFR 60.4201(a), 40 CFR 1039 Appendix I, and 40 CFR 1039.101]:

Pollutant Emission Limits (g/kW-hr)

Plant Gen 1 and Plant Gen 2

i.    20 percent during the acceleration mode;

ii.   15 percent during lugging mode; and

iii.  40 percent during the peaks in either the acceleration or lugging modes. Note that this condition is streamlined with the requirements of 20 DCMR 606.1.

The Department of Energy and Environment (DOEE) has reviewed the permit application and related documents and has made a preliminary determination that the applicant meets all applicable air quality requirements promulgated by the U.S. Environmental Protection Agency (EPA) and the District. Therefore, draft permit No. 7321-SM has been prepared.

The permit application and supporting documentation, along with the draft permit are available for public inspection at AQD and copies may be made available between the hours of 8:15 A.M. and 4:45 P.M. Monday through Friday. Interested parties wishing to view these documents should provide their names, addresses, telephone numbers and affiliation, if any, to Stephen S. Ours at (202) 535-1747. Copies of the draft permit and related technical support memorandum are available in the attachments section below.

A public hearing on this permitting action will not be held unless DOEE has received a request for such a hearing within 30 days of the publication of this notice. Interested parties may also submit written comments on the permitting action. The written comments must include the person’s name, telephone number, affiliation, if any, mailing address and a statement outlining the air quality issues in dispute and any facts underscoring those air quality issues. All relevant comments will be considered in issuing the final permit.  

Comments on the draft permit and any request for a public hearing should be addressed to:

Stephen S. Ours Chief, Permitting Branch - Air Quality Division

Department of Energy and Environment 1200 First Street NE, 5th Floor Washington, DC 20002

No comments or hearing requests submitted after August 29, 2022 will be accepted.

For more information, please contact Stephen S. Ours at (202) 535-1747 or [email protected] .

EIN Presswire's priority is source transparency. We do not allow opaque clients, and our editors try to be careful about weeding out false and misleading content. As a user, if you see something we have missed, please do bring it to our attention. Your help is welcome. EIN Presswire, Everyone's Internet News Presswire™, tries to define some of the boundaries that are reasonable in today's world. Please see our Editorial Guidelines for more information.